Broadwater City Farm

Client: London Borough of Haringey & Back2Earth

Cave was appointed by Haringey Council in January 2008 to complete designs for a new sustainable City farm. These included classrooms; workshops; staff offices; refreshment areas; animal housing; storage; a vegetable garden; poultry orchard and butterfly tunnel.

The process has established a close working relationship between Cave, LBH, B2E. All working towards the one goal of building Haringey’s first Zero Carbon structure that would be built and co-designed with the help of local residents. Ultimately providing a beautiful, fun place to safely learn about the environment, animal welfare, where food comes from and how it is grown.

Other Public Projects

Hastings Country Park - New Visitor Centre

Cave has been appointed by Hastings Borough Council to work with Groundwork South East, the council and the community on a new sustainable, community built visitor centre in Hastings Country Park Nature Reserve. The new facility will aim to educate visitors about this unique part of the Jurassic coastline, it's geology, flora and fauna and local history. It will be designed to blend into the beautiful natural surroundings and be as sustainable as possible; using locally sourced materials and built by the local community.Continue reading

Surrey Eco Spa

Cave designed an underground eco spa, with open light wells providing light to all spaces as well as creating sunken hidden courtyards and lush open air pools. The buildings were to be built of rammed earth and chalk, powered by solar PV's and a ground source heat pump.Continue reading

Farm buildings, Haslemere.

This project was to design some agricultural barns for a farm in Haslemere. Cave worked on the designs and planning approval for this project, with the construction carried out by the farmer and a main contractor.Continue reading

RSPB - Coombes Valley

This project was a collaboration between Cave and Amazonails. The Coombes valley RSPB group had an existing outdoor classroom building made of timber frame and straw, with a green roof and rammed car tyre foundations. The client asked Cave to help them convert and extend this building.Continue reading

Timber frame, Strawbale infill Office HQ

Operating nationwide, Mosscliff Environmental Ltd is a renowned market leader in supply and installation of renewable energy systems, including wind turbines, solar PV and biomass boilers, they approached Cave to design them an office that reflected their sustainable ethos and could cope with their rapidly growing team.Continue reading

Preston - Wheatfields

Preston, Re-development Competition. This competition was to redevelop a small site in Preston to accommodate a range of residential units suitable for disabled access, working from home and extended families.Continue reading